We have a 150 kVA dry type transformer that is a part of a bigger packaged unit. That question came up.
The transformer case will be bonded, there will be equipment grounding conductors run between the panel feeding it and the transformer.
Looking at the NEC 250.4 ... it doesn't appear this is required.
The transformer case will be bonded, there will be equipment grounding conductors run between the panel feeding it and the transformer.
Looking at the NEC 250.4 ... it doesn't appear this is required.