Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Dose the ASME U Stamp status changes

Status
Not open for further replies.

oali

Mechanical
Nov 2, 2009
1
0
0
ES
Dose the ASME U stamp status changes for new pressure vessel/column in case, if vendor need to weld at site 1) External on pressure retaining part 2) internal welding over the SS cladding on KSC shell 3) internal direct welding over the pressure retaining parts.
If the status changes from U stamp to A1 or R1, does the value of equipment reduce if it is insured.

Thanks.



 
Replies continue below

Recommended for you

Once you make all that internal / external re-work on the stamped vessel, you have voided the U-stamp and turned it into a second hand equipment. You have to go through a complex testing process to prove that the vessel is good as the new one, then it might retain the value;- otherwise, depending on the modifications you made, the value might go down or may even increase (say you may have deposited gold weld overlay on the previous CRA cladding joints or replaced sections of CRA overlay with an exotic SS material or you have added two more manways and the missing saddle...).
However, if part of the vessel fabrication is the site erection and welding together of the bits and pieces delivered separately on site, that is just normal part of the fabrication, provided that all the relevant code requirements for U-stamping of the vessel have been complied with. In that case, the U-stamp is not voided (because the Vendor has not yet applied the U-stamp) and the vessel value has not been altered since the final value has not yet been established until after the U-stamp and full acceptance.
Is that clear now?
Cheers,
gr2vessels
 
Hi,

Your question is of a jurisdictional matter pretty much. After the vessel was finally completed and final ASME stamp was applied, ASME rules will be no longer applicable. From this point, any welding to pressure retaining elements will be regulated by a local Jurisdiction. If adopted by the Jurisdiction, the applicable Code will be NBIC and this job will be called a repair or an alteration. So, the advice is to contact a local Jurisdiction that regulates pressure vessels.

Good Luck.
 