Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations pierreick on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Double Bullwheel Shaft Loading

1athoti

Mechanical
Jun 1, 2022
12
Hi,

I'm working on a bullwheel capstan system for underground cable pulling.
Can someone give input on whether I'm approaching the loads on the shafts correctly?

From capstan calcs (mainly US Navy wire rope handbook) I'm aiming for 100,000 lbf on final wrap and should be able to achieve it with the 2 sheaves driven by hydraulic motors, geared down etc.
Here I'm considering each individual shaft (both being similar in loading).
The gear shown is driven by another pinion gear with a torque which would create aprox. Wt = 36000 lbf and Wr = 13000 lbf on each gear.
Can I approximate Fpull at center of shaft as 2 x wire rope tension = 200,000 lbf to calculate total loads on the shaft?

Thank you!

bullwheels 1.jpg

bullwheels 2.jpg
 
Replies continue below

Recommended for you

OP
Look at other capstan designs. Your design looks weak. Not robust.
No gears on top of the capstan. Notice the design of the capstan on other are flared.
Both ends.
 

Part and Inventory Search

Sponsor