I am working with a Double Suction BB1 pumps with Flush Plan 13
As I suppose, one of the successful requirement for plan 13 is that the Stuffing Box Pressures is higher than the sunction pressure.
For double suction pumps, is that met?
Anyone knows how to calculate/estimate the Stuffing Box Pressure?
Thanks
MSc. Mechanical Engineering;
5 years EPC experience;
Oil & Gas industry in Canada.