WARose
Structural
- Mar 17, 2011
- 5,594
Been a while since I have done one of these.....am confused on the weld. Not worried about the weld to the web: it's a full-pen to stiffener that is full-penned to the web. Am sort of worried about the weld on the flange side of the doubler.....because quite frankly, I cannot find much guidance here (unless it is a special moment frame in a seismic situation, and this isn't). So what should the weld strength be on that end? Thanks.