Mining
Jan 14, 2005
1
If I doze a heap of X cubic meters for 30 meters from A to B. I then doze the same material from B to C for 30 meters.
If it takes me 1 hour to do all this job what is my production per hour? Is it X cubic meters or X times 2?
why ?
I am aware of factors that need to taken into account when calculating.
 
Replies continue below

Recommended for you

Your productivity is X cubic meters/hr. Why? Because you've moved X cubic meters over a distance of 60 m in the course of 1 hour. Only the time to complete the total cycle matters, not each stage.
 