Dear Sir
The cyclone reactor with DPT and its tube (attached drawing)
I wonder is the process connections should be at least 1/2" NPT and instrument should be equipped with socket or yoke for mounting on a 2" pipe. A yoke is not required if instrument is mounted on a
vessel or process line.
But, the size of this pipe for DPT is decided by instrument or piping ? there is no hint on P&ID. Please help me out.
Thank you very much for your kindly help.
The cyclone reactor with DPT and its tube (attached drawing)
I wonder is the process connections should be at least 1/2" NPT and instrument should be equipped with socket or yoke for mounting on a 2" pipe. A yoke is not required if instrument is mounted on a
vessel or process line.
But, the size of this pipe for DPT is decided by instrument or piping ? there is no hint on P&ID. Please help me out.