The manufacturing company I work for builds equipment out of 80% sheet metal components, 20% machined components. We are updating some of our product lines, and are starting to incorporate molded parts. My (broad) question centers on what drawing requirements are needed to receive components as specified on the drawing?
For example, do I need to specify the parting line if its non-critical? Shouldn't I leave this up to the vendor?
Do I cover the major draft angle in a general note, and dimensionally specify other draft angles that deviate from the note?
Any opinions and help welcomed.
[green]"Art without engineering is dreaming; Engineering without art is calculating."[/green]
Have you read faq731-376 to make the best use of Eng-Tips Forums?
For example, do I need to specify the parting line if its non-critical? Shouldn't I leave this up to the vendor?
Do I cover the major draft angle in a general note, and dimensionally specify other draft angles that deviate from the note?
Any opinions and help welcomed.
[green]"Art without engineering is dreaming; Engineering without art is calculating."[/green]
Have you read faq731-376 to make the best use of Eng-Tips Forums?