structengineer
Structural
- Jun 16, 2005
- 22
I am writing a spec for drilled piers. The owner did not provide a geotech report, but through investigation of other structures at the site, we believe that we need to use drilled piers. We are going to require the owner to hire a geotech engineer after the contract is awarded to verify our design. Anyway, I am looking at the spec, and there is several sections relating to testing, including a Load test, Penetration test, and a Proof Test Hole. Is there a rule of thumb of how many piles should be load tested, etc. since I don't have a geotech engineer to talk to? Our job has approximately 50 drilled piers across a stretch of about a 1/2 mile.