Guest
It's my understanding that there is no major difference in the structural design of various types of drilled piles. Whether it's a traditional drilled pile, augercast pile, slurry-tremie, etc., the structural design should be the same. The method of construction may be different, but the end result for the structural design would be essentially the same. Is this correct, or is there something else to it?