I've got a project where I am going to put in some post-installed (Hilti) anchors in reinforced concrete. Usually I am worried about them hitting (and damaging/cutting) the re-bar putting them in......but in this case, they've got to go where they've got to go. (And I've checked the footing with these bars cut and it's ok.)
Based on previous experience (and reading through some older threads) it appears going through the re-bar is certainly possible. (Apparently you have to change drill bits.) But what is worrying me based on what I am reading is the time/schedule factor. So my question is: Does it take a great deal of time to get this done? If you need a anchor number and embedment depth: we are talking about a dozen anchors embedded about 24 inches. Thanks.
Based on previous experience (and reading through some older threads) it appears going through the re-bar is certainly possible. (Apparently you have to change drill bits.) But what is worrying me based on what I am reading is the time/schedule factor. So my question is: Does it take a great deal of time to get this done? If you need a anchor number and embedment depth: we are talking about a dozen anchors embedded about 24 inches. Thanks.