ridgeline
Civil/Environmental
- May 29, 2008
- 28
We are testing the compaction for a building pad. Per the Proctor Test, the optimum moisture content is 8% but the pad right now is at 16%. The pad is about 18" thick. Is there a rule of thumb as to how long it might take to dry to the optimum moisture content?