therrero
Structural
- Sep 15, 2004
- 5
Long time lurker, first time poster and I have a question for the group when it comes to an existing precast parking garage located near Denver, Colorado.
We were recently contacted to put together an engineer estimate for some repair work to fix a large number of completely corroded flange connector shear plates. The garage is slab on grade lower floor and precast double tee upper floor. It appears that the upper floor has some major sealing issues and water (CaCl2 during the winter months) is working its way below the topping and making its way to the shear connectors - the majority of them are completely corroded. The contractor wants to leave the existing shear connection in place and add an additional C10 channel centered between the existing connection with adhesive anchors embedded in the two inch concrete flange to replace the shear capacity and provide continuity between flanges for vehicle loading. After this fix, they will reseal the upper deck. Supposedly they have done this many times and had no issue with it. This detail seems pretty questionably to me. The structure will see moderate wind and seismic loads.
I have attached some photos as well as a sketch of what the contractor is proposing. In my opinion, it would be best to chip and remove the concrete flange and add in new shear connections, but I know the client would never go for it. This structure needs to be kept accessible as much as possible. Does anyone know of a reliable fix (or design standard) for this kind of situation? We have reviewed ACI 362.2 as well as PCI Parking Garage design and they really never address typical repair and replacement details. I appreciate the comments in advance. Thanks!
We were recently contacted to put together an engineer estimate for some repair work to fix a large number of completely corroded flange connector shear plates. The garage is slab on grade lower floor and precast double tee upper floor. It appears that the upper floor has some major sealing issues and water (CaCl2 during the winter months) is working its way below the topping and making its way to the shear connectors - the majority of them are completely corroded. The contractor wants to leave the existing shear connection in place and add an additional C10 channel centered between the existing connection with adhesive anchors embedded in the two inch concrete flange to replace the shear capacity and provide continuity between flanges for vehicle loading. After this fix, they will reseal the upper deck. Supposedly they have done this many times and had no issue with it. This detail seems pretty questionably to me. The structure will see moderate wind and seismic loads.
I have attached some photos as well as a sketch of what the contractor is proposing. In my opinion, it would be best to chip and remove the concrete flange and add in new shear connections, but I know the client would never go for it. This structure needs to be kept accessible as much as possible. Does anyone know of a reliable fix (or design standard) for this kind of situation? We have reviewed ACI 362.2 as well as PCI Parking Garage design and they really never address typical repair and replacement details. I appreciate the comments in advance. Thanks!