I have a 6 story healthcare building. Each air handler (2 total) is around 140,000 cfm.
What type of construction is permissable for the supply and return shafts?
How are the takeoffs for each floor sealed at the shaft?
Leakage testing advised?
What type of construction is permissable for the supply and return shafts?
How are the takeoffs for each floor sealed at the shaft?
Leakage testing advised?