antony09
Mechanical
- Feb 17, 2003
- 26
WE NEED TO INCREASE THE CFM TOTAL THROUGH THE COIL OF DX SYSTEM, THE CAPACITY OF THE EQUIPMENT IS 20 TONS, THE NOMINAL FLOW IS 8000 CFM, BUT WE NEED TO GET MORE CAPACITY OF THIS EQUIPMENT, THEREFORE WE INCREASE THE FLOW TO 12,500 CFM, BUT THE PRESSURE OF THE EQUIPMENT ARE WRONG, PER EXAMPLE SUCTION PRESSURE= 60 PSIG AND DISCHARGE PRESSURE = 280 PSIG, I UNDERSTOOD THE CARRYOVER EFECT WHEN WE INCREASE THE FLOW, BUT IN THIS MOMENT WE DONT HAVE THIS PROBLEM, THE PROBLEM IS THAT THE EQUIPMENT DONT INCREASE YOUR CAPACITY, PLEASE IF ANY PEOPLE KNWO WHAT HAPPENING WITH THE REFRIGERANT CIRCUIT, EXLAIN ME.