Good_Guy
Civil/Environmental
- May 6, 2019
- 28
I am seeking the best way to backfill between a concrete structure and the sloped cut
I have attached an approximate sketch. The requirement is compacting the backfill in layers not more than 300mm
The width of placment is approx 2m at the base and the height
The length of the backfill is about 20 metres
The contractor is almost placing at layers of 300mm but has done for only 9 metres and has almost created a vertical joint for the balance of placement(11 metres)
Can such a steep joint be created for earth backfill?
I hope I am clear..please see the sketch
I have attached an approximate sketch. The requirement is compacting the backfill in layers not more than 300mm
The width of placment is approx 2m at the base and the height
The length of the backfill is about 20 metres
The contractor is almost placing at layers of 300mm but has done for only 9 metres and has almost created a vertical joint for the balance of placement(11 metres)
Can such a steep joint be created for earth backfill?
I hope I am clear..please see the sketch