Hi All,
I am doing the preliminary design for a mobile mining unit and trying to work out what to do with the earthing. The unit is running on tank tracks and moves about 30m every 3-4 days. Onboard there is a trailing cable running from an external cable reeler to a 6.6kV RMU (which also feeds another mobile unit that follows it) and then a transformer which supplies the onboard MCC with a running load of about 800kW (DOL and VSD driven motors and auxiliaries).
I am looking for advice from anyone else that may have undertaken something similar to ensure that the earthing, touch and step potentials for the unit are adequate. Any advice would be gratefully received.
Thanks
Goldyvb
I am doing the preliminary design for a mobile mining unit and trying to work out what to do with the earthing. The unit is running on tank tracks and moves about 30m every 3-4 days. Onboard there is a trailing cable running from an external cable reeler to a 6.6kV RMU (which also feeds another mobile unit that follows it) and then a transformer which supplies the onboard MCC with a running load of about 800kW (DOL and VSD driven motors and auxiliaries).
I am looking for advice from anyone else that may have undertaken something similar to ensure that the earthing, touch and step potentials for the unit are adequate. Any advice would be gratefully received.
Thanks
Goldyvb