Getting ready to place some Econocrete, Lean Mix. Spec calls for 1200 @ 28 day. If strength exceeds 1200 spec requires us to saw the joints in the econocrete. 28 day breaks came in at an average of 1130 psi. I was wondering if sawing the joints exactly on the same pattern that the 14" PCC will be will cause a problem? I was thinking they should be offset a very small amount. Like 2" or so. Should we even saw them? ANy info will be appreciated. SB