Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

editing multi-operations

Status
Not open for further replies.

spottydot

Aerospace
Apr 21, 2004
36
IS THERE A WAY TO CHANGE THE COMMON PARAMETER IN THE NC OPERATIONS. I HAVE ABOUT 200 HOLES THAT ARE NOT NORMAL TO THE SURFACE AND I HAVE A DIFFERENT OPERATION FOR EACH HOLE AND WOULD LIKE TO CHANGE THE DEPTH AND PECK OF EACH HOLE. IS THERE A THERE A WAY TO CHANGE THEM ALL AT ONCE.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor