tony1851
Structural
- Oct 10, 2012
- 98
Hi all,
Steel beam spanning 9.6m in masonry opening, simply-supported on the masonry each end. Top flange is adequately restrained by two incoming steel beams; the top flange of the subject beam supports a de-stabilizing wall load along its full length. - see image.
How would I evaluate an effective length?
Steel beam spanning 9.6m in masonry opening, simply-supported on the masonry each end. Top flange is adequately restrained by two incoming steel beams; the top flange of the subject beam supports a de-stabilizing wall load along its full length. - see image.
How would I evaluate an effective length?