Zdane
Aerospace
- Jan 21, 2004
- 3
Hi there:
I hope that some of you guys might be able to direct me to some reference material on quantification of near knife-edge installation of HiLites, all with interference fit.
Structure has passed fatigue test with no cracks reported. Yet, without some quantitative analysis it is next to impossible to handle manufacturing deviations.
TIA
Zdane
I hope that some of you guys might be able to direct me to some reference material on quantification of near knife-edge installation of HiLites, all with interference fit.
Structure has passed fatigue test with no cracks reported. Yet, without some quantitative analysis it is next to impossible to handle manufacturing deviations.
TIA
Zdane