JJCist
Mechanical
- Feb 18, 2002
- 7
Hi,
I would like to verify if there is a time constraint for fabrication of an pressure vessel after design, and where can I find this. According to me I am only allowed 6 months after a new addendum / code have been issued to design according to the older revision and that I am not allowed to manufacture (Stamp on nameplate) a vessel as design 2001 add 2002 in a year of manufacture 2005. If somebody can please guide me to where this is written in ASME or the South African Occupational Health and Safety Act 85 of 1993, I will highly appreciate this.
I would like to verify if there is a time constraint for fabrication of an pressure vessel after design, and where can I find this. According to me I am only allowed 6 months after a new addendum / code have been issued to design according to the older revision and that I am not allowed to manufacture (Stamp on nameplate) a vessel as design 2001 add 2002 in a year of manufacture 2005. If somebody can please guide me to where this is written in ASME or the South African Occupational Health and Safety Act 85 of 1993, I will highly appreciate this.