Electrical enclosures are tested for flameproof and IP testing and aslo pressure testing per Baseefa which excludes from having any furthur periodic pressure testing. But EN13980 of european standards suggests periodic hydrotesting of enclosures. Can anyone suggest if proper pressure testing is already been taken care of then it does exclude the hydrotesting or not.
Also if the enclosures are hydrotested per UL/CENELAC does the enclosures still need to go for any hydrotesting per EN13980.
I appreciate any help or suggestions regarding this.