As per API 2000, the need of emergency venting is not required provided the rules in 3.4.3 are met. Let say, the roof for the tank is design to be weak roof-to-shell thus the emergency venting is not required. Is this true?
However it also mentioned in API 2000, the emergency venting is required to avoid failure of the weak roof-to-shell joints.
Also can anyone provide me some example calculation for the fire relief requirement. Also what criteria to determine the liquid is hexane type or higher than hexane as mentioned in Table-2 for C-factors.