Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

End bearing piles 1

Status
Not open for further replies.

downunder73

Structural
Feb 21, 2009
2
A two-storey building on a highly reactive site is founded on a grid of piles. The soil profile shows a 4m deep reactive clay horizon overlying a deep profile of dense sands. Could there be a problem with founding the piles at the top of the dense sand?
 
Replies continue below

Recommended for you

Yes, the clay in changing volume could move the piles up and down if the supported loads are light. The piles should be founded deep enough in the sand to resist any uplift, and the piles designed for the resulting tension. As well, the structure supported on the piles should be isolated from the swelling material with a void former. Your geotech should be able to give you the design parameters for the uplift.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor