downunder73
Structural
- Feb 21, 2009
- 2
A two-storey building on a highly reactive site is founded on a grid of piles. The soil profile shows a 4m deep reactive clay horizon overlying a deep profile of dense sands. Could there be a problem with founding the piles at the top of the dense sand?