jacobpiping
Petroleum
- Jun 30, 2006
- 2
In PIPING ENGG. Varies doc.to be issued.
How to calculate Piping Man-hrs?
How much man-hours to be taken per line as Engg. Std?
If we have one project contains 200 lines (2" to 20") and we consider following activities.
1. From feed study to develop final studies
2. And upto final construction layout and isometrics
If anyone having information please reply
Jacobson
Piper.group@yahoo.com
How to calculate Piping Man-hrs?
How much man-hours to be taken per line as Engg. Std?
If we have one project contains 200 lines (2" to 20") and we consider following activities.
1. From feed study to develop final studies
2. And upto final construction layout and isometrics
If anyone having information please reply
Jacobson
Piper.group@yahoo.com