motunrayo
Mechanical
- Mar 7, 2005
- 4
Hi, i am engaged in a write-up and i will like to know the EPC cost for a 2400m dept floating and fixed offshore rig. i will also like to know the duration to complete such project and a likely EPC contractor in Americal.
i will be gratefull if i can these information.
i will be gratefull if i can these information.