BSE05
Structural
- Sep 16, 2005
- 127
This is a followup to a previous post a couple of months ago. The problem is to enlarge existing footings in place to support the addition of two new floors without underpinning (due to spacial constraints).
After running numbers on punching shear the existing footings fail under the increased load. There is room to pour on top of the existing footing. Has anyone had experience with this and how to best transfer shear to upper slab? I was thinking about welding angles to column.