Oct 20, 2005 #1 qilin Civil/Environmental Oct 5, 2005 1 0 0 US In Paydirt, how do I enter the borehole data Say: Depth Topsoil 0 - 1' Sand 2-4 Rock From 4' I couldn't get a proper report if I input the data as relative depth from the existing elevation. Should I use 4' for my rock? Thanks
In Paydirt, how do I enter the borehole data Say: Depth Topsoil 0 - 1' Sand 2-4 Rock From 4' I couldn't get a proper report if I input the data as relative depth from the existing elevation. Should I use 4' for my rock? Thanks