Ebbie22
Mechanical
- Oct 24, 2007
- 29
So we have standard configurable components. Usually the states are at Production but when adding a config we change the state to Adding New Configuration. After adding the config and check-in the file a lot of our designers forget to advance the states back to Production.
Is there an administrative setting to automatically advance an EPDM State during check-in without having to create a variable with a manual input? Or is there something that can be linked to the Adding New Configuration State? Or does this need to be completed via a custom add-in?
Thanks,
Todd
Is there an administrative setting to automatically advance an EPDM State during check-in without having to create a variable with a manual input? Or is there something that can be linked to the Adding New Configuration State? Or does this need to be completed via a custom add-in?
Thanks,
Todd