Equipment damage during SPT

Status
Not open for further replies.

benjaman

Civil/Environmental
Sep 26, 2004
43
0
0
AU
Hi,
we are doing Standard penetration Test for a depth of 35. The rope controlling the hammer gave away after reaching a depth of 22m.

My question is can we still continue with the same bore hole for the remaining depth after the equipment is repaired?
 
Replies continue below

Recommended for you

Yes. The rope is just a means to lift the hammer. It shouldn't impede its free fall. The driller will have to adjust his technique slightly to accommodate the new rope, but they do that routinely. A new rope has increased friction on the cathead, so the hammer will be easier to lift, initially. This will cause a tendency to overlift the hammer.

If you have questions, do a stress-wave energy test on the rig using ASTM D4633. This can be used to compare different drill rigs and operators.
 