eatapeach
Military
- Jun 20, 2013
- 76
Can anyone provide me a code section that states how many bolts are required to be installed in beam holes during erecting of steel building? This is not a pre-engineered steel building. I was told by the contractor only 2 are required to be installed where 6 holes are located until all work is complete. No loads are imposed at this time only erection. I was under the impression it was 50%. I have looked in the AISC but could not find anything.