Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Error during analysis of job

Status
Not open for further replies.

technodam

Mechanical
Oct 8, 2012
18
hello,
I am doing the simple analysis of bracket with 2 horizontal holes. i applied pressure on the top of the bracket and fixed the bottom of the plate in X-direction.
can anyone tell me, What does the error ‘Too many attempts made for this increment’ mean? and what would be the possible reason for this and what would be the solution?
 
Replies continue below

Recommended for you

Too many increments means exactly what it says, the Newton-Rhapson method can not converge in the number of increments that are specified (5 times cutback in increment time).

If you are doing a simple analysis there are either more warnings (numerical singularities and/or negative eigenvalues) which suggest you didn't define your BC's well, or you are taking a too large initial time increment, but if you are doing a simple linear elastic test even a time increment of 1 should be enough, so it's probably a matter of boundary conditions.
Or an extremely bad mesh.
 
The warning shown is
'2208 elements are distorted. Either the isoparametric angles are out of the suggested limits or the triangular or tetrahedral quality measure is bad. The elements have been identified in element set WarnElemDistorted.

No output variables associated with this field output group.'

so what would be the cause of this warning? I havn't got it.
 
> Or an extremely bad mesh.

Or you are loading unrealistically high/fast
Or you messed up units in loading, material stiffness and dimensions.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor