KenStructural
Structural
- Jan 26, 2012
- 40
I'm using an ETABS 9.7 to analyze a four story building and i really don't know on how to extract Rho (Reliability/Redundancy Ratio) for each element in ETABS. Could you give me the procedure on how to do it. Thanks