An existing MV residential distribution system is not being used for more than 5 years. The owner wants to issue a tender for refurbishing the system and complete it before energization. I wonder should what the contractor should do?
1- Consider as if these equipment and cables are operational and perform maintenance tests (megger, DC resistance for CBs, tans delta for transformers....etc) for every piece of equipment and cables, excluding faulty equipment (eye inspection), or
2- Re-perform FAT routine tests on major equipment (switchgear, CBs, VTs, CTs,Transformers) and megger test existing cables (end-to-end) - DC test.
On other hand, is there any LV test to be performed on existing underground cables? DC Megger?
any clues?
1- Consider as if these equipment and cables are operational and perform maintenance tests (megger, DC resistance for CBs, tans delta for transformers....etc) for every piece of equipment and cables, excluding faulty equipment (eye inspection), or
2- Re-perform FAT routine tests on major equipment (switchgear, CBs, VTs, CTs,Transformers) and megger test existing cables (end-to-end) - DC test.
On other hand, is there any LV test to be performed on existing underground cables? DC Megger?