jrflyer
Structural
- Apr 3, 2007
- 1
The issue is the depth of the exfiltration system. The exfiltration system is comprised of 24"x35" Aluminum Perforated Steel Type II Gauge Pipe. The pipes are wrapped in Mirafi fabric and have 6" 57 stone coverage on top and bottom per detail. In total the cross section is 6" + 24" pipe +6" for 3'-0". The FF. Elev. is set at 0.0' and per the detail the top of pipe is at -1.5' This only provides 1'0" from top of Mirafi fabric to top of C.I.P. slab. 5" C.I.P. slab and 7" compacted soil. Please advise with any suggestions on depth of top of pipe. Keep in mind that this is under a drive aisle with 3000# point load. Thanks.