ProActive
Mechanical
- May 18, 2004
- 3
We are replacing 2 existing 6.5MBTU Boilers with 6 2MBTU 2 stage boilers. We would like to use the existing stack but have some concerns weather it will work properly. We need to know what the minimum amount of boiler stages we need on to create enough flow and if we will have condensation issues. We basically need a professional engineer to do exhaust gas calculations to determine if our design will work, and if so what are the appropriate operating parameters. Can anyone help us find someone with this?