JONMACDOUGALL
Industrial
- Feb 14, 2011
- 1
I AM A RESIDENT ENGINEER FOR A BROWNFIELD CONTRUCTION PROJECT FOR SEVERAL CRUDE OIL PUMPING STATIONS. OUR CLIENT IS RESPONSIBLE FOR THE DETAILLED ENGINEERING AND ISSUING ALL PLANS AND NECESSARY DOCUMENTATION REQUIRED FOR CONSTRUCTION.
I WOULD LIKE TO KNOW WHAT IS CONSIDERED AN ACCEPTABLE LEVEL OF INACCURACY FOR DOCUMENTATION ISSUED FOR CONSTRUCTION (i.e. 5-10%?). WHAT PERCENTAGE OF DOCUMENTS / DRAWINGS ISSUED FOR CONSTRUCTION WOULD NORMALLY UNDERGO MODIFICATION DURING CONSTRUCTION DUE TO ERRORS OR OMISSIONS?
THANKS!
I WOULD LIKE TO KNOW WHAT IS CONSIDERED AN ACCEPTABLE LEVEL OF INACCURACY FOR DOCUMENTATION ISSUED FOR CONSTRUCTION (i.e. 5-10%?). WHAT PERCENTAGE OF DOCUMENTS / DRAWINGS ISSUED FOR CONSTRUCTION WOULD NORMALLY UNDERGO MODIFICATION DURING CONSTRUCTION DUE TO ERRORS OR OMISSIONS?
THANKS!