What is a reasonable expected tolerance to expect an earthworks contractor to be able to meet if blasting a flat pad out of exposed bedrock?
Intuitively, i would think that you might expect typical variations of +/- 500mm or so, but I'm trying to justify this somehow for estimating purposes (to calculate how much fill we'd need to import to raise the blasted surface to a given elevation).
Any thoughts are appreciated, and thanks ahead of time.
Intuitively, i would think that you might expect typical variations of +/- 500mm or so, but I'm trying to justify this somehow for estimating purposes (to calculate how much fill we'd need to import to raise the blasted surface to a given elevation).
Any thoughts are appreciated, and thanks ahead of time.