We are being asked to mediate between developer and concrete forming sub (there is no GC), project is a big box retail centre. Some foundation walls are exposed such as loading dock areas, but there was no 'architectural specification'. Contractor has filled tie holes, patched/rubbed and done grinding of fins/joints etc. There must be some allowance carried by concrete contractors to cover 'expected' repairs. Contractor is looking for extras, the owner is 'expecting perfection', and hanging onto holdback.
Any thoughts?
Any thoughts?