swamydhas
Electrical
- Aug 14, 2014
- 2
Dear All,
Could you some one guide me that in Main roof (no shelter) 4 cooling towers has been installed.Power cables have installed by means of cable tray, the issue is control cables (1cx2.5 sqmm) and belden cables (BMS) to be installed by means of either GL trunking/GI rigid conduit? Can some one help me which method to be followed with IEE/IEC standards, it will help me lot.
Expecting your advice.
Thanks,
swamydhas.
Could you some one guide me that in Main roof (no shelter) 4 cooling towers has been installed.Power cables have installed by means of cable tray, the issue is control cables (1cx2.5 sqmm) and belden cables (BMS) to be installed by means of either GL trunking/GI rigid conduit? Can some one help me which method to be followed with IEE/IEC standards, it will help me lot.
Expecting your advice.
Thanks,
swamydhas.