weron4u
Structural
- Jun 27, 2003
- 46
A fall arrest system is required to have an anchor point capable of holding 5000#. Is the anchor point required to hold this 5000# without exceeding the yield stress? I have a beam that can hold 4500# in the elastic region and about 8000# in the plastic region. Does this meet OSHA code?