Is there a defined logic order for updating family table instances from the values in the table?
I have a hydraulic fitting that will successfully regenerate for 7 of the 8 instances. When I changed the generic values to be close to the instance that failed, I now get 5 of the 8 to regenerate.
The whole shape, except the hex cut, is in a single revolved sketch, not the way I would have created it, but that is what I was given to work with. I don't really want to change this since I don't want the existing assemblies to fail because of features that are new.
"Wildfires are dangerous, hard to control, and economically catastrophic."
Ben Loosli
Sr IS Technologist
L-3 Communications
I have a hydraulic fitting that will successfully regenerate for 7 of the 8 instances. When I changed the generic values to be close to the instance that failed, I now get 5 of the 8 to regenerate.
The whole shape, except the hex cut, is in a single revolved sketch, not the way I would have created it, but that is what I was given to work with. I don't really want to change this since I don't want the existing assemblies to fail because of features that are new.