We did a bad thing.
We are a precaster. We detailed and cast our R/C columns with only 1 1/2" cover to the main longitudinal. It was a miss, but we caught it before it was erected.
There any way around the minimum cover requirement of 2" (we need a three-hour rating)? They've cast five out of the 20 we have on the job, trying to save these five.
We've dug into the code, we are digging further into it tomorrow, but it seems hopeless.