Dear sir.
Postbending heat treatment is required when the maximum calculated fiber elongation after bending exceeds 50% of the specified basic min. elongation for the applicable material according to para. 332.4.2 of ASME B31.3.
Please let me know how to calculate fiber elongation(equataion)after bedning of the pipe or tube.
Postbending heat treatment is required when the maximum calculated fiber elongation after bending exceeds 50% of the specified basic min. elongation for the applicable material according to para. 332.4.2 of ASME B31.3.
Please let me know how to calculate fiber elongation(equataion)after bedning of the pipe or tube.