oengineer
Structural
- Apr 25, 2011
- 731
The contractor was in the process of drilling a straight shaft drilled pier when weather systems caused the drilling to cease. The drill depth achieved was roughly 29ft in which bearing strata was not encountered. The pier is supposed to have a total length of 40 ft. The pier hole was filled back in with dirt.
I am thinking that we could just have the contractor re-drill a slightly larger hole to ensure adequate and competent surrounding earth and also deepen it a bit to also ensure adequate capacity.
Any suggestions on additional resolutions on how to proceed with this pier penetration are welcomed.
I am thinking that we could just have the contractor re-drill a slightly larger hole to ensure adequate and competent surrounding earth and also deepen it a bit to also ensure adequate capacity.
Any suggestions on additional resolutions on how to proceed with this pier penetration are welcomed.