Could someone explain their understanding of the construction requirements of a field welded moment connection for a OMF in seismic site class D between a beam flange and column flange? Specifically, how are the welds supposed to be run out/ground off at their ends to eliminate stress risers. Also, I have been told that the bottom backer bar has to be removed, the weld back gouged and a 5/16 fillet placed over the original weld. Is this requirement only for a OMF? only in class D? Why is the bottom weld different then the top weld?
Any thoughts would be appreciated.