weldgal
Industrial
- Apr 28, 2006
- 46
Want to be sure I'm not over simplifying things for a B31.3 job, on a 4" XXH joint with GTAW (root) and SMAW (balance). If I use ER80S-D2 GTAW and E8018-C2 SMAW, is that "overkill"? Any input would help.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.