dcoppo
Marine/Ocean
- Mar 30, 2007
- 13
I don't have acess to D1.1 right now, but the AISC guidelines call for a minimum 1/4 inch fillet reinforcement for a CJP groove weld for a tee joint. My present research seems to show that this reinforcement is strictly a fatigue treatment. I have data for fillet reinforcement of partial penetration grove welds that provides the fillet size to match the fatigue strength of the base metal to the weld metal. Is this the correct criteria?