ContractorDave
Mechanical
- Jan 16, 2007
- 364
I have some older systems in hi rise buildings with fire pumps that have never been set up or run as required. Some of these pumps will put the system upwards of 175psi. Would you shut the main valve and allow the CRV to circulate the water for the ten minutes and then put the system back in normal service?